Marine Operations – Project History

ok-cesl

OML119 - NPDC - FIELD SERVICE

Location: Houston TX
Duration: March 2018 – Present
Project Scope:Subsea Intervention and FPSO

  • Subsea Intervention Vessel
  • Subsea Intervention Eqiupment Spreads
  • Subsea Intervention Service
  • Temporary FPSO FEED
rbqtholkudrubhhg3xet

OML122 - PEAK PETROLEUM - FPSO FIELD DEVELOPMENT

Location:Houston TX
Duration:Jan 2018 – Present
Project Scope:FPSO FIELD DEVELOPMENT

  • FPSO Topsides
  • FPSO Hull
  • FPSO Production Risers
  • FPSO Moorings
  • Deployment and Activation of EPS FSO with Drilling
download

MAERSK CHISSONGA FPSO, TLP AND FLOWLINE INSTALLATIONS - ANGOLA

Location:Houston TX
Duration: May. 2014 – Feb. 2015
Project Scope:INSTALLATION ENGINEERING

  • Installation contract review and updates
  • Installation proposals, review and recommendations
  • Installation Engineering
  • Recommended and implemented contract changes for FPSO Installation
  • Developed cost comparison TLP vs. Subsea Development
  • Recommended changes from TLP to Susbea development.

OFFSHORE EXECUTION

  • Planned for Year 2019
ok-intecsa
hess

AMERADA HESS TLP INSTALLATION - GOM

Location:Houston TX
Duration:May. 2013 – Nov 2018
Project Scope:
  • Riser Pull-In System Engineering
  • Interfacing with Heerema, Hess, IntecSea
  • SCR Installation Engineering (Procedures)
  • Steel Catenary Riser Offshore Installation
ok-intecsa
ok-bp

THUNDER HORSE PRODUCTION PLATFORM - MOORING CHAIN JACK REPLACEMENT PROCEDURES - GOM

Location:
  • Houston TX
  • Mississippi Canyon block 778. US Gulf of
    Mexico
Duration:Jun. 2012 – Nov. 2017
Project Scope:INSTALLATION ENGINEERING

  • Equipment Engineering
  • Specialized Design Engineering
  • Installation Aids Engineering
  • Construction Plan Installation Aids
  • Mooring Hang-Off Procedures
  • Design of Rigging Equipment

OFFSHORE EXECUTION (incl. all construction crews)

  • Planned for year 2017
ok-exxon

XIKOMBA FPSO DECOMMISSIONING AND DISCONNECT – 1310M WATER DEPTH - GOM

Location:Offshore Disconnect; Angola
Duration:2011
Project Scope:OFFSHORE EXECUTION (in charge of all offshore executions)

  • Project Management & Client Representation
  • Decommissioning Procedure Review and Approval
  • FPSO Disconnect Procedure
  • Disconnect of Turret Moorings
  • Flusing of Risers and Umbilicals
  • Disconnect of Umbilicals
  • Disconnect of Risers
  • FPSO Station Keeping / Positioning
ok-ba
eni

OYO - ARMADA PERDANA FPSO INSTALLATION - 425M WATER DEPTH - NIGERIA

Location:Offshore Installation; Nigeria
Duration:Aug. 2008 – Nov. 2009
Project Scope:INSTALLATION ENGINEERING

  • Delivery of Installation 150t A-Frame – IOC Sing
  • Delivery of Installation 300t Reel Drive System – IOC Sing.
  • Supply of ROV system
  • Conversion of a mid-sized AHTS to a subsea construction vessel
  • Deck Equipment Preparation.
  • Riser Pull-In System Design

OFFSHORE EXECUTION (incl. all construction crews)

  • Mooring Pre-Set Installation
  • FPSO Mooring Hook-Up and Positioning
  • Riser Hook-Up & Pull in operations
m3energy
ok-petronas

RATU SONGKHLA FSO INSTALLATION – 50M WATER DEPTH - INDONESIA

Location:
  • Engineering; Singapore
  • Offshore Installation; Malaysia
Duration:May 2009 – Aug 2009
Project Scope:INSTALLATION ENGINEERING

  • Project Management / Client Representation
  • Installation Procedure Review and Approval

OFFSHORE EXECUTION (incl. construction superintendent)

  • Mooring Pile & Mooring Installations
  • FPSO Hook-Up To Moorings
  • Flowline & Riser Installations
  • FPSO Positioning

 

ok-cesl
shell

SPM3 CALM BUOY REPAIR – 50M WATER DEPTH - NIGERIA

Location:
  • Engineering; Singapore
  • Offshore Repair; Nigeria
Duration:2009
Project Scope:INSTALLATION ENGINEERING

  • Mooring Analysis
  • Repair Engineering & Procedures

OFFSHORE EXECUTION (incl. all construction crews & Marine Spread)

  • Supply of all offshore construction crew and supervisors
  • Management of ships and offshore crew
  • Offshore mooring and floating hose Repair and adjustment
  • CALM Buoy system placed back into operation
ok-ba
afren

ARMADA PERKASA FPSO INSTALLATION – 13M WATER DEPTH - NIGERIA
Shallowest FPSO Ever Installed (13 m Water Depth)

Location:
  • Engineering; Singapore and Houston
  • Offshore Installation; Nigeria
Duration:2007
Project Scope:INSTALLATION ENGINEERING

  • EPIC Installation Contract
  • Installation Engineering
  • Deck Pull-in Equipment Preparation

OFFSHORE EXECUTION (incl. all construction crews & Marine Spread)

  • Supply of Chartered Marine Spread
  • Conversion / updgrade of main installation vessel
  • Supply of Installation components / aids
  • Offshore mooring Pre-Set Installation
  • FPSO Mooring Hook-Up and positioning
  • Riser Hook-Up – Pull-in
ok-bp

BP ATLANTIS PRODUCTION SEMI-SUBMERSIBLE RISER INSTALLATION – 2,150M WATER DEPTH - GOM
Deepest Steel Catenary Risers (SCR's) Ever Installed

Location:
  • Engineering; Houston
  • The deepest offshore installation every
  • Offshore Installation; Gulf of Mexico
Duration:2005
Project Scope:
  • Installation, assembly of the SCR pull in 1250 Ts chain jack system (SCR = Steel Catenary Risers)

OFFSHORE EXECUTION (incl. all construction crews)

  • Managed / executed all Riser Pull in Operations 2,150M water depth
  • Bp representative for review of field development pipelaying (J-Lay) operations procedures
  • Bp representative for all hook-up operations
exxon-mobil-logo (2)

KIZOMBA B FPSO INSTALLATION – 1,400M WATER DEPTH - ANGOLA
Largest FPSO Ever Installed

Location:
  • Engineering; Houston
  • Offshore Installation; Angola

The deepest offshore installation every executed.

Duration:2005
Project Scope:
  • Project Management
  • Mooring System Design
  • Installation Equipment Specification
  • Installation Procedure Development

OFFSHORE EXECUTION (incl. all construction crews)

  • Managed all deck operations for mooring hook-up and tensioning
ok-exxon

KIZOMBA A FPSO INSTALLATION – 1,400M WATER DEPTH - ANGOLA

Location:
  • Engineering; Houston
  • Offshore Installation; Angola
Duration:2003
Project Scope:
  • Project Management
  • Mooring System Design
  • Installation Equipment Specification
  • Installation Procedure Development
  • Managed all deck operations for mooring hook-up, positioning and tensioning
800px-Chevron_Logo.svg
png-transparent-chevron-corporation-texaco-logo-gasoline-coreldraw-logo-sign-area

AGBAMI FPSO INSTALLATION STUDY – 1,430M WATER DEPTH - ANGOLA

Location:
  • Engineering; Houston
  • Offshore Installation: Angola
Duration:2004
Project Scope:
  • Mooring System Design Study
  • Installation Procedures
  • Implementation of new installation methods
ok-bp

HOLSTEIN SPAR INSTALLATION – 1,310M WATER DEPTH - GOM

Location:
  • Engineering; Houston
  • Offshore Installation; Gulf of Mexico
Duration:2003
Project Scope:
  • Installation Project Management
ok-bp

MAD DOG SPAR INSTALLATION – 1,400M WATER DEPTH - GOM

Location:
  • Engineering; Houston
  • Offshore Installation; Gulf of Mexico
Duration:2004
Project Scope:
  • Installation Project Management
  • Engineering – implementation of 1st synthetic permanent mooring in GOM

Load Handling Equipment – Project History

ok-technifmc

MARINE WELL CONTAINMENT SYSTEM - GOM

Location:Engineering & PMT; Houston
Duration:Jan 2013 – Sep 2014
Project Scope:
  • Supply of Sr Engineers for detailed design of MWCS components;
ok-technifmc

DELIVERY OF MOORING EQUIPMENT – EARLY PRODUCTION VESSEL - VENEZUELA

Location:
  • Engineering & PMT; Houston
  • Fabrication; China
Duration:April 2012 – January 2013
Project Scope:
  • Design and delivery of deck mooring equipment to include;
  • Qty 2 – 150 ton Deck Pull-In Winches and control consoles
  • Winch HPU unit
  • 50 ton Deck Winch
  • Mooring fairleads and chain stoppers
  • Horizontal Deck Sheaves
  • Load Monitoring System
murphy-oil-corp

CAT Well Intervention Tower - MALAYSIA

Location:
  • Engineering, Fabrication & Delivery: Singapore
  • Offshore testing and operations Malaysia
Duration:March 2011 – Aug 2011
Project Scope:
  • FEED Study Engineering for fit to purpose tower
  • Structural Analysis
  • Engineering Drawings
  • Tower Fabrication works
  • Hydraulic Heave Compensator System
  • Control System and sensors
  • Offshore testing / operation
  • Operations and maintenance manuals
ame

100T Knuckle Boom Crane - SINGAPORE

Location:Engineering, Fabrication & Delivery: Singapore
Duration:Mar 2011 – July 2011
Project Scope:
  • Engineering to Modification of 100T Knuckle Boom Crane
asl

2T X 10M Fixed Boom Marine Crane with Class Approval for Man-ridingN - SINGAPORE

Location:
  • Engineering, Fabrication & Delivery: Singapore
  • Offshore  testing  and commissioning: Batam
Duration:Jul 2011 – Sep 2011
Project Scope:
  • Engineering design of 2T x 10m Fixed Boom Marine Crane with Class Approval for Man-riding
  • Fabrication and Delivery
ktl

120T Spooler & HPU - SINGAPORE

Location:Engineering, Fabrication & Delivery: Singapore
Duration:Sep 2010 – May 2011
Project Scope:
  • Supply of materials and labor to fabricate 100kW Engine Driven Hydraulic Power Unit
  • Materials provided include: housing with double hinge locking door, vent, lifting lugs and forks recess at the bottom of the Engineering work for design and calculation, Hydraulic.
onasis-indonesia

30T Pipelaying Tensioner + AR Winch - INDONESIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:Mar 2011 – Sep 2011
Project Scope:
  • Engineering design
  • Supply of all material and components Fabrication and Delivery
  • Fabrication and Delivery
ark-group

HPU and Arm Actuators for Automated Car Loading System - AUSTRALIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:Jul 2011  – Sep 2011
Project Scope:
  • Engineering design for HPU and Arm Actuators
  • Supply of all material and components
  • Fabrication and Delivery
sapura-acergy

ROV Grab Bars - MALAYSIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:3/1/11
Project Scope:
  • Engineering services to design the MSS ROV Grab Bars.
sapura-acergy

Shackle Support JIG - MALAYSIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:3/1/11
Project Scope:
  • Engineering of Shackle Support
  • Fabrication of 2T SWL Support
  • Integration of customer’s Hydraulic Cylinder
sapura-acergy

FJC Handling System - MALAYSIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:April 2011 – May 2011
Project Scope:
  • Provision of design, procurement and fabrication of Field Joint Coating Handling Equipment for MV Sapura 3000
  • Fabrication & Delivery
sapura-acergy

Hangoff Platform Hydraulic System - MALAYSIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:April 2011 – May 2011
Project Scope:
  • Hydraulic Cylinders supply and delivery for Hydraulic System for Hangoff Platform.
sapura-acergy

Sapura 3000 Gangway - MALAYSIA

Location:Engineering, Fabrication & Delivery: Singapore
Duration:April 2011 – July 2011
Project Scope:
  • Engineering Design and Fabrication drawings of Sapura 3000 Offshore Gangway to Cargo Barge Access.
ezra

EZRA 350T A-Frame - MALAYSIA

Location:
  • Engineering: Singapore
  • Fabrication: Vietnam
Duration:March 2010 – Dec 2010
Project Scope:
  • Engineering Design
  • Procurement and supply of all material to fabricate to include, steel works, hydraulics, controls and electrical components, HPU
  • Fabrication supervision, Project Management and QA/QC
ok-ba

AT104 - BAB 150T A-Frame - MALAYSIA

Location:Engineering, Fabrication and Delivery; Singapore
Duration:Jan 2009 – June 2009
Project Scope:
  • Engineering Design
  • Fabrication to include supply of all material; steel works, hydraulics, controls and electrical components, HPU
  • Project Management and QA/QC
  • Integration on vessel and acceptance testing
ok-ba

OYO - BAB FPSO Deck Mooring Equipment - 1,200 t - SINGAPORE

Location:Engineering, Fabrication and Delivery; Singapore
Duration:Jan 2009 – June 2009
Project Scope:
  • Engineering, Fabrication and Delivery of;
  • Qty 12 – 90MM Chain Stoppers
  • Qty 12 – Fairleads to include underdeck stiffing engineering
  • Horizontal deck sheaves
  • Supply and installation of 175 ton deck pull in winches
misc-berhard

FPSO Cendor Deck Mooring Equipment - 1,500t - MALAYSIA

Location:Engineering, Fabrication and Delivery; Singapore
Duration:Jul 2010 – Dec 2011
Project Scope:
  • Provision of Engineering Design, Project Management, QA/QC, Fabrication and Delivery of;
  • Qty 12 – 105mm R4 Chain Stoppers with load monitoring for spread monitoring
  • Qty 4 – 88mm Horizontal Deck Sheaves
  • Qty 2 – 10T SWL Hydraulic Hawser Storage Reel
ok-ba

OYO - BAB FPSO Deck Mooring Equipment - 1,200 t - SINGAPORE

Location:Engineering, Fabrication and Delivery; Singapore
Duration:Jan 2009 – June 2009
Project Scope:
  • Engineering, Fabrication and Delivery of;
  • Qty 12 – 90MM Chain Stoppers
  • Qty 12 – Fairleads to include underdeck stiffing engineering
  • Horizontal deck sheaves
  • Supply and installation of 175 ton deck pull in winches
ok-ba

Armada Perkasa – Refurbishment of FPSO Deck Mooring Equipment – 1,000 t - SINGAPORE

Location:Engineering, Fabrication and Refurbishment; Singapore
Duration:September 2007 – January 2008
Project Scope:
  • Refurbishment of the deck pull in sheave
  • Refurbishment of the deck sheaves
  • Refurbishment of chain stoppers
  • Engineered and Installed the pull in sheave arrangements on the riser porch for riser pull-in operations
ok-ba

Armada Perkasa – Refurbishment of FPSO Deck Mooring Equipment – 1,000 t - SINGAPORE

Location:Engineering, Fabrication and Refurbishment; Singapore
Duration:September 2007 – January 2008
Project Scope:
  • Refurbishment of the deck pull in sheave
  • Refurbishment of the deck sheaves
  • Refurbishment of chain stoppers
  • Engineered and Installed the pull in sheave arrangements on the riser porch for riser pull-in operations
ok-bp

Atlantis SCR Pull-in System – 1,200 t - HOUSTON

Location:Engineering Houston, Offshore Operations GOM
Duration:Aug 2006 – 2007
Project Scope:
  • Installation, assembly and operation of the 1250Ts SCR pull in chain jack system