Our engineering solutions are market-driven, experience-based, and focused on delivering the best solution for fast-to-market oil and gas production.
IOC has detailed knowledge about the Oil and Gas business from both an engineering and operations view point. With our diverse expertise and experience in a broad range of disciplines, we are able to deliver innovative and high-quality solutions at the most competitive price and with a fast track schedule.
Below is a brief overview of IOC’s process for bringing a field into production:
Field assessment
Pre-Front End Engineering and Design (FEED) and FEED Engineering
Field development consortiums
Development of Capital Expenditure (CAPEX) Finance
EPCI Development of the field to first oil
Discipline Leads for all required project scopes via project team consortium
Technically sound reduced CAPEX development with return to all stakeholders

Our Track Record
Let our experience speak for itself

OML119 - NPDC - FIELD SERVICE
Duration: March 2018 – Present
Project Scope:
- Subsea Intervention and FPSO
- Subsea Intervention Vessel
- Subsea Intervention Equipment Spreads
- Subsea Intervention Service
- Temporary FPSO FEED

OML122 - PEAK PETROLEUM - FPSO FIELD DEVELOPMENT
Duration: Jan 2018 – Present
Project Scope:
- FPSO FIELD DEVELOPMENT
- FPSO Topsides
- FPSO Hull
- FPSO Production Risers
- FPSO Moorings
- Deployment and Activation of EPS FSO with Drilling

MAERSK CHISSONGA FPSO, TLP AND FLOWLINE INSTALLATIONS - ANGOLA
Duration: May. 2014 – Feb. 2015
Project Scope:
INSTALLATION ENGINEERING
- Installation contract review and updates
- Installation proposals, review and recommendations
- Installation Engineering
- Recommended and implemented contract changes for FPSO Installation
- Developed cost comparison TLP vs. Subsea Development
- Recommended changes from TLP to Subsea development.

AMERADA HESS TLP INSTALLATION - GOM
Duration: May. 2013 – Nov 2018
Project Scope:
- Riser Pull-In System Engineering
- Interfacing with Heerema, Hess, IntecSea
- SCR Installation Engineering (Procedures)
- Steel Catenary Riser Offshore Installation

THUNDER HORSE PRODUCTION PLATFORM - MOORING CHAIN JACK REPLACEMENT PROCEDURES - GOM
Houston TX
Mississippi Canyon block 778. US Gulf of
Mexico
Duration: Jun. 2012 – Nov. 2017
Project Scope:
INSTALLATION ENGINEERING
- Equipment Engineering
- Specialized Design Engineering
- Installation Aids Engineering
- Construction Plan Installation Aids
- Mooring Hang-Off Procedures
- Design of Rigging Equipment

XIKOMBA FPSO DECOMMISSIONING AND DISCONNECT – 1310M WATER DEPTH - GOM
Location: Offshore Disconnect; Angola
Duration: 2011
Project Scope:
OFFSHORE EXECUTION (in charge of all offshore executions)
- Project Management & Client
- Representation
- Decommissioning Procedure Review and Approval
- FPSO Disconnect Procedure
- Disconnect of Turret Moorings
- Flusing of Risers and Umbilicals
- Disconnect of Umbilicals
- Disconnect of Risers
- FPSO Station Keeping / Positioning

OYO - ARMADA PERDANA FPSO INSTALLATION - 425M WATER DEPTH - NIGERIA
Duration: Aug. 2008 – Nov. 2009
Project Scope:
INSTALLATION ENGINEERING
- Delivery of Installation 150t A-Frame – IOC Sing
- Delivery of Installation 300t Reel Drive System – IOC Sing.
- Supply of ROV system
- Conversion of a mid-sized AHTS to a subsea construction vessel
- Deck Equipment Preparation.
- Riser Pull-In System Design
OFFSHORE EXECUTION (incl. all construction crews)
- Mooring Pre-Set Installation
- FPSO Mooring Hook-Up and Positioning
- Riser Hook-Up & Pull in operations

RATU SONGKHLA FSO INSTALLATION – 50M WATER DEPTH - INDONESIA
Engineering; Singapore
Offshore Installation; Malaysia
Duration: May 2009 – Aug 2009
Project Scope:
INSTALLATION ENGINEERING
- Project Management / Client Representation
- Installation Procedure Review and Approval
OFFSHORE EXECUTION (incl. construction superintendent)
- Mooring Pile & Mooring Installations
- FPSO Hook-Up To Moorings
- Flowline & Riser Installations
- FPSO Positioning

SPM3 CALM BUOY REPAIR – 50M WATER DEPTH - NIGERIA
Location:
Engineering; Singapore
Offshore Repair; Nigeria
Duration: 2009
Project Scope:
INSTALLATION ENGINEERING
- Mooring Analysis
- Repair Engineering & Procedures
OFFSHORE EXECUTION (incl. all construction crews & Marine Spread)
- Supply of all offshore construction crew and supervisors
- Management of ships and offshore crew
- Offshore mooring and floating hose Repair and adjustment
- CALM Buoy system placed back into operation

ARMADA PERKASA FPSO INSTALLATION – 13M WATER DEPTH - NIGERIA Shallowest FPSO Ever Installed (13 m Water Depth)
Engineering; Singapore and Houston
Offshore Installation; Nigeria
Duration: 2007
Project Scope:
INSTALLATION ENGINEERING
- EPIC Installation Contract
- Installation Engineering
- Deck Pull-in Equipment Preparation
OFFSHORE EXECUTION (incl. all construction crews & Marine Spread)
- Supply of Chartered Marine Spread
- Conversion / upgrade of main installation vessel
- Supply of Installation components / aids
- Offshore mooring Pre-Set Installation
- FPSO Mooring Hook-Up and positioning
- Riser Hook-Up – Pull-in

BP ATLANTIS PRODUCTION SEMI-SUBMERSIBLE RISER INSTALLATION – 2,150M WATER DEPTH - GOM Deepest Steel Catenary Risers (SCR's) Ever Installed
Engineering; Houston
Offshore Installation; Gulf of Mexico
Duration: 2005
Project Scope:
- Installation, assembly of the SCR pull in 1250 Ts chain jack system (SCR = Steel Catenary Risers)
OFFSHORE EXECUTION (incl. all construction crews)
- Managed / executed all Riser Pull in Operations 2,150M water depth
- Bp representative for review of field development pipelaying (J-Lay) operations procedures
- Bp representative for all hook-up operations

KIZOMBA B FPSO INSTALLATION – 1,400M WATER DEPTH - ANGOLA Largest FPSO Ever Installed
Engineering; Houston
Offshore Installation; Angola
Duration: 2005
Project Scope:
- Project Management
- Mooring System Design
- Installation Equipment Specification
- Installation Procedure Development
OFFSHORE EXECUTION (incl. all construction crews)
- Managed all deck operations for mooring hook-up and tensioning

KIZOMBA A FPSO INSTALLATION – 1,400M WATER DEPTH - ANGOLA
Engineering; Houston
Offshore Installation; Angola
Duration: 2003
Project Scope:
- Project Management
- Mooring System Design
- Installation Equipment Specification
- Installation Procedure Development
- Managed all deck operations for mooring hook-up, positioning and tensioning

AGBAMI FPSO INSTALLATION STUDY – 1,430M WATER DEPTH - ANGOLA
Engineering; Houston
Offshore Installation: Angola
Duration: 2004
Project Scope:
- Mooring System Design Study
- Installation Procedures
- Implementation of new installation methods

HOLSTEIN SPAR INSTALLATION – 1,310M WATER DEPTH - GOM
Engineering; Houston
Offshore Installation; Gulf of Mexico
Duration: 2003
Project Scope:
- Installation
- Project Management

MAD DOG SPAR INSTALLATION – 1,400M WATER DEPTH - GOM
Engineering; Houston
Offshore Installation; Gulf of Mexico
Duration: 2004
Project Scope:
- Installation Project Management
- Engineering – implementation of 1st synthetic permanent mooring in GOM
Load Handling Equipment – Project History

MARINE WELL CONTAINMENT SYSTEM - GOM
Duration: Jan 2013 – Sep 2014
Project Scope:
- Supply of Sr Engineers for detailed design of MWCS components;

DELIVERY OF MOORING EQUIPMENT – EARLY PRODUCTION VESSEL - VENEZUELA
Engineering & PMT; Houston
Fabrication; China
Duration: April 2012 – January 2013
Project Scope:
Design and delivery of deck mooring equipment to include;
- Qty 2 – 150 ton Deck Pull-In Winches and control consoles
- Winch HPU unit
- 50 ton Deck Winch
- Mooring fairleads and chain stoppers
- Horizontal Deck Sheaves
- Load Monitoring System

CAT Well Intervention Tower - MALAYSIA
Engineering, Fabrication & Delivery: Singapore
Offshore testing and operations; Malaysia
Duration: March 2011 – Aug 2011
Project Scope:
- FEED Study Engineering for fit to purpose tower
- Structural Analysis
- Engineering Drawings
- Tower Fabrication works
- Hydraulic Heave Compensator System
- Control System and sensors
- Offshore testing / operation
- Operations and maintenance manuals

100T Knuckle Boom Crane - SINGAPORE
Engineering, Fabrication & Delivery: Singapore
Duration: Mar 2011 – July 2011
Project Scope:
- Engineering to Modification of 100T Knuckle Boom Crane

2T X 10M Fixed Boom Marine Crane with Class Approval for Man-ridingN - SINGAPORE
Location:
Engineering, Fabrication & Delivery: Singapore
Offshore testing and commissioning: Batam
Duration: Jul 2011 – Sep 2011
Project Scope:
- Engineering design of 2T x 10m Fixed
- Boom Marine Crane with Class Approval for Man-riding
- Fabrication and Delivery

120T Spooler & HPU - SINGAPORE
Location: Engineering, Fabrication & Delivery: Singapore
Duration: Sep 2010 – May 2011
Project Scope:
- Supply of materials and labor to fabricate 100kW Engine Driven Hydraulic Power Unit
- Materials provided include: housing with double hinge locking door, vent, lifting lugs and forks recess at the bottom of the Engineering work for design and calculation, Hydraulic.

30T Pipelaying Tensioner + AR Winch - INDONESIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: Mar 2011 – Sep 2011
Project Scope:
- Engineering design
- Supply of all material and components
- Fabrication and Delivery
- Fabrication and Delivery

HPU and Arm Actuators for Automated Car Loading System - AUSTRALIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: Jul 2011 – Sep 2011
Project Scope:
- Engineering design for HPU and Arm
- Actuators
- Supply of all material and components
- Fabrication and Delivery

ROV Grab Bars - MALAYSIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: 3/1/11
Project Scope:
- Engineering services to design the MSS ROV Grab Bars.

Shackle Support JIG - MALAYSIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: 3/1/11
Project Scope:
- Engineering of Shackle Support
- Fabrication of 2T SWL Support
- Integration of customer’s Hydraulic Cylinder

FJC Handling System - MALAYSIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: April 2011 – May 2011
Project Scope:
- Provision of design, procurement and fabrication of Field Joint Coating Handling Equipment for MV Sapura 3000
- Fabrication & Delivery

Hangoff Platform Hydraulic System - MALAYSIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: April 2011 – May 2011
Project Scope:
- Hydraulic Cylinders supply and delivery for Hydraulic System for Hangoff Platform.

Sapura 3000 Gangway - MALAYSIA
Location:
Engineering, Fabrication & Delivery: Singapore
Duration: April 2011 – July 2011
Project Scope:
- Engineering Design and Fabrication drawings of Sapura 3000 Offshore Gangway to Cargo Barge Access.

EZRA 350T A-Frame - MALAYSIA
Location:
Engineering: Singapore
Fabrication: Vietnam
Duration: March 2010 – Dec 2010
Project Scope:
- Engineering Design Procurement and supply of all material to fabricate to include, steel works, hydraulics, controls and electrical components, HPU
Fabrication supervision, Project Management and QA/QC

AT104 - BAB 150T A-Frame - MALAYSIA
Location:
Engineering, Fabrication and Delivery; Singapore
Duration: Jan 2009 – June 2009
Project Scope:
- Engineering Design
- Fabrication to include supply of all material; steel works, hydraulics, controls and electrical components, HPU
- Project Management and QA/QC
- Integration on vessel and acceptance testing

OYO - BAB FPSO Deck Mooring Equipment - 1,200 t - SINGAPORE
- Location:
Engineering, Fabrication and Delivery; Singapore
Duration: Jan 2009 – June 2009
Project Scope:
Engineering, Fabrication and Delivery of; - Qty 12 – 90MM Chain Stoppers
- Qty 12 – Fairleads to include underdeck stiffing engineering
- Horizontal deck sheaves
- Supply and installation of 175 ton deck pull in winches

FPSO Cendor Deck Mooring Equipment - 1,500t - MALAYSIA
Location:
Engineering, Fabrication and Delivery; Singapore
Duration: Jul 2010 – Dec 2011
Project Scope:
Provision of Engineering Design, Project Management, QA/QC, Fabrication and Delivery of;
- Qty 12 – 105mm R4 Chain Stoppers with load monitoring for spread monitoring
- Qty 4 – 88mm Horizontal Deck Sheaves
- Qty 2 – 10T SWL Hydraulic Hawser Storage Reel

OYO - BAB FPSO Deck Mooring Equipment - 1,200 t - SINGAPORE
Location:
Engineering, Fabrication and Delivery; Singapore
Duration: Jan 2009 – June 2009
Project Scope:
Engineering, Fabrication and Delivery of;
- Qty 12 – 90MM Chain Stoppers
- Qty 12 – Fairleads to include underdeck stiffing engineering
- Horizontal deck sheaves
- Supply and installation of 175 ton deck pull in winches

Armada Perkasa – Refurbishment of FPSO Deck Mooring Equipment – 1,000 t - SINGAPORE
Location:
Engineering, Fabrication and Refurbishment; Singapore
Duration: September 2007 – January 2008
Project Scope:
- Refurbishment of the deck pull in sheave
- Refurbishment of the deck sheaves
- Refurbishment of chain stoppers
- Engineered and Installed the pull in sheave arrangements on the riser porch for riser pull-in operations

Atlantis SCR Pull-in System – 1,200 t - HOUSTON
Location: Engineering Houston, Offshore Operations GOM
Duration: Aug 2006 – 2007
Project Scope:
- Installation, assembly and operation of the 1250Ts SCR pull in chain jack system